Level by fitting metal shims under the feet.

Blower

Motor

Rubber

Isolation

Feet

Cut the banding straps.

Control

2. Install the Bath

WARNING: Risk of personal injury. This cast iron bath is extremely heavy. Obtain sufficient help to carefully lift and move it.

NOTICE: Do not lift the bath by the piping or blower, or use the piping or blower for structural support of the bath. To avoid damage to the bath, lift by the rim at the sides of the bath.

Carefully move the bath into position.

Level the bath by fitting metal shims under the feet as needed. Check for level along the rim. Make sure the bath is resting on all four feet.

Cut the Banding Straps

IMPORTANT! This step is necessary to make the bath operate more quietly.

Cut the two banding straps from the blower.

Install the Plumbing

Insert the drain tailpiece into the trap. Secure the drain tailpiece to the trap.

Install the faucet valve.

Check the drain connections for leakage.

1199249-2-A

6

Kohler Co.

Page 6
Image 6
Kohler 1199249-2-A manual Install the Bath, Cut the Banding Straps, Install the Plumbing