Blower Motor
Mounting Screws
Elbow
Check
Valve
Cover
Junction Box
Baseboard
Screw
Control
To Blower Motor
Blower Motor
Electrical Plug
4. Disconnect the Blower Motor - Remote
NOTICE: This section applies only to installations in which the blower motor and check valve are being relocated.
NOTICE: Do not cut the blower piping for this installation.
NOTICE: You must relocate the check valve with the blower motor. Do not disconnect the check valve from the tee.
Remove the Blower Motor and Check Valve
Disconnect the blower motor electrical plug from the control.
Remove any cable ties that support the blower motor cord.
Remove and retain the screw holding the check valve to the PVC elbow.
Remove and retain the four screws from the baseboard.
Slide the blower motor and check valve away from the elbow, and remove the blower motor from the bath.
Prepare the Site
NOTE: Refer to the ″Prepare the Blower (Remote Site)″ section for blower relocation details.
Prepare the site where the blower motor will be installed. The site must be within 15’ (4.5 m) of the bath.
Install an access panel to service the blower motor.
Prepare the routing paths for the PVC piping and the new blower motor power cable. Follow all applicable codes.
8 | Kohler Co. |