Lenovo 1045, 1046, 1047, 1048 manual Top view of the battery card assembly

Models: 1048 1045 1046 1047

1 140
Download 140 pages 10.44 Kb
Page 62
Image 62

the fast charge cycle will terminate prematurely, thus preventing the battery card assembly from reaching a fully charged state.

Attention:

When attaching the battery card assembly to a PCI Express slot, center the Phillips-head screw driver to avoid damaging the screw head and do not over-tighten the screws as you might damage the battery card assembly.

The battery in the battery card assembly must recharge for at least six hours during fast charge under normal operating conditions.

To install the battery card assembly onto the RAID controller, do the following:

a.Note the top view and bottom view of the battery card assembly. Then, insert the battery pack harness connector into the J4 battery pack harness connector on the backside of the battery card assembly. For more information, refer to the following illustrations.

Figure 40. Top view of the battery card assembly

1

Battery pack harness

Figure 41. Bottom view of the battery card assembly

1

2

3

J4 battery pack harness connector

J5 board-to-board connector

J2 connector

b. With the front side up, place the RAID controller on a flat, clean, static-free surface.

50ThinkServer User Guide

Page 62
Image 62
Lenovo 1045, 1046, 1047, 1048 manual Top view of the battery card assembly