Table 29. Removal steps of base cover assembly, I/O sub card, and I/O sub card cable (continued)

Note: Applying labels to the base cover

The new base cover FRU is shipped with a kit containing labels of several kinds. When you replace the base cover, you need to apply the following labels:

18

Homologation label

Following labels need to be peeled off from the old base cover, and need to be put on the new base cover.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

19

20

Windows license label (COA)

Qualcomm Wireless WAN label

Ericsson wireless WAN label

Wireless LAN MAC address label

MAC address label

SIRM labels

Israel label (76.3 mm x 31.6 mm)

Wireless card label (only for Brazil)

Modem label (only for PRC model)

Bluetooth label (only for Brazil)

China wireless WAN label

Israel label (63.5 mm x 19 mm)

Anatel wireless WAN label (only for Brazil)

Vodafone label

Modem AMOM label (only for Brazil)

FCC label

Information label

Serial number label

Asset tag label

For some models, you also need to apply one or two FCC labels. Check the old base cover; if it has one or two FCC labels, find duplicates of them in the label kit and apply them to the new base cover.

128ThinkPad T410 and T410i Hardware Maintenance Manual

Page 136
Image 136
Lenovo 2518X01, 2522K4U manual ThinkPad T410 and T410i Hardware Maintenance Manual