Installation

SuggestedTool Requirements

PREPARATION OF CHASSIS

1.Remove the screws which fasten the cabinet at both sides and at the back.

2.Slide the unit out from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.

3.Cut the window sash seal to the proper length. Peel off the backing and attach the Foam-PE to the underside of the window sash.

Shipping screws

Figure 2

Figure 3

4.Remove the backing from Foam-PE with 3 holes and attach it to the bottom of the Top retainer bar.

5.Attach the Top retainer bar on the top of the cabinet with 3 screws (Type A).

 

Top retainer bar

Foam-PE

Foam-PE

Figure 4

 

 

6.

Insert the Frame guides into the bottom of the cabi-

 

 

 

 

net.

Top retainer bar

 

 

7.

Insert the Frame Curtain into the Top retainer bar

 

 

 

 

and Frame guides.

 

 

 

8.

Fasten the curtains to the unit with 10 screws

 

 

 

 

(Type A) at both sides.

Screw

 

 

 

 

(Type A)

Screw(Type A)

 

 

Frame guide

Figure 5

 

 

Service Manual

10

Page 11
Image 11
LG Electronics RAD-243A, WG1805RY6, WG2405RY6, RAD-183A service manual Suggested Tool Requirements, Preparation of Chassis