Manuals
/
Liebert
/
Computer Equipment
/
Network Card
Liebert
manual
Liebert XDV
Models:
XDV
1
1
48
48
Download
48 pages
38 Kb
1
2
3
4
5
6
7
8
<
>
Specs
Install
Dimension
Maintenance
Stacking configuration offset
Mounting clip placement
Safety
Page 1
Image 1
Pr
e
ci
s
io
n
C
o
o
li
n
g
Fo
r
B
u
si
n
es
s
-C
r
iti
c
al
C
o
n
tinuit
y
™
Li
e
be
r
t X
D
V
™
Us
e
r
M
a
n
u
a
l–50
&
6
0 Hz
Page 2
Page 1
Image 1
Page 2
Contents
Liebert XDV
Fluorinated Greenhouse Gas Requirements-European Union
General Safety Guidelines
Table of Contents
Maintenance
Installation Checklist and System Fill for Startup
Specifications
Electrical
Figures
Page
Liebert XDV component locations
Example XDV10BK
Installation Considerations
Pre-Installation Checks
Installation
References
Checking and Unpacking
Product/System Description
General Product Information
Recyclable Packaging
Equipment Inspection
Unpacking the Unit Domestic Packaging
Unit Handling
Removing export shipping package
Export Packaging
Removing Liebert XDV from shipping pallet
Removing the Liebert XDV from the Pallet
Dimensional data
Determining Placement in the Conditioned Space
Mechanical Considerations
Changing the Liebert XDV’s air intake location
Changing the Air Intake Location
Mounting the Liebert XDV
Mounting the Liebert XDV on Top of the Cabinet
Bolting Liebert XDV to Top of Cabinet
Bottom View
Mounting clip placement
Using Supplied Clips for Mounting
Suspended Mounting Method
Suspension hardware and bracket dimensional data
11mm 22mm Top View 2 64mm 76mm 102mm DPN000770
Pg , Rev
Suspending the Liebert XDV from Overhead Structures
Suspending the Liebert XDV from Unistruts
Suspending Liebert XDV from the overhead structure
Stacking configuration offset
Mounting Liebert XDVs in Stacked Setup
Stacked Liebert XDVs suspended from Unistruts
Hanging Stacked Liebert XDVs from Unistruts
Hanging Stacked Liebert XDVs from the Overhead Structure
European Union Fluorinated Greenhouse Gas Requirements
System Connection Configuration
Piping
Piping Connections to Liebert XDP or Liebert XDC
Connection Methods and Points
Right Side Liebert XDV
Holding Charge-Hard-Piped Units
Hard Piped Connection Sizes
Brazing Preparations-Hard-Piped Units
Recommended Piping Size
Branch piping sizes for refrigerant loop
Connection Methods-One-Shot Connections
Connecting Liebert XD Flex Pipe to Liebert XDV Modules
Field Installation of Liebert Flex Pipe Kit on Liebert XDV
Refrigerant Charge-Pre-Charged Option
Tools Required
Liebert XD prefabricated piping assembly
Overtighten
With wrench
Return
Piping mains without Liebert XDV and Liebert Flex Pipe
Insulation
Electrical
Connecting High Voltage Cables for CSA/C-US Certified Units
Rear Liebert XDV
Rear of Liebert XDV
Liebert XDV electrical connections for CE-approved units
Condensate Detection Connections
Connecting Low Voltage Wiring-Optional
Rear View of Liebert Xdvto be N.E.C. Class
Installation Checklist and System Fill for Startup
Checklist for Proper Installation
Operation
Start the Liebert XDV
Maintenance
Internal Access
Fluorinated Greenhouse Gas Requirements
Accessing internal electrical components
Accessing Internal Electrical Components
To remove the fan tray
Liebert XDV10 specifications
Specifications
Liebert XDV8 specifications
Liebert XD Liebert Flex Pipe assemblies, supply and return
Page
Iti
Ne t
Ti n
That
Top
Page
Image
Contents