Piping

Figure 23 Hard-piped connection diagram

Return Main (seen from end )

2-1/8" O.D. or 2-5/8" O.D.

Acceptable Arc

5/8” Refrigerant -Grade

Full-Port Ball Valve

Field-Supplied and

Field-Installed

Recommended Arc

Supply Main

(seen from end ) 1-1/8" O.D.

or 1-3/8" O.D.

1/2” Refrigerant-Grade

Full-Port Ball Valve

Field-Supplied and

Field- Installed

Copper Tubing Total length of each line from Liebert XDV to Main; not to exceed 72" (1829mm)

Refer to Table 4 for details.

Top of Liebert XDV

Right Side

of Liebert XDV

21

Page 27
Image 27
Liebert manual Right Side Liebert XDV