Piping
Figure 25 Schrader valve location for venting holding charge
Front of Liebert XDV
Top of Liebert XDV
Schrader
Valve
SCHRADER VALVE
SUPPLY( IN)
RETURN (OUT)
Supply pipe |
| Return pipe |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
connection |
| Rear of XDV |
| ||||||
(1/2" OD) |
| connection |
|
|
|
|
|
|
|
|
| (5/8" OD) |
|
|
|
|
|
|
|
6.4.2Brazing Preparations—Hard-Piped Units
After the holding charge for a
During brazing, the lines must be filled with flowing dry nitrogen to prevent excessive oxidation and scale formation inside the piping. Prevailing good refrigeration practices must be employed for piping supports, leak testing, dehydration and charging. Failure to use good system practices may result in damage to the system. Refer to the ASHRAE refrigeration handbook for general
6.5Recommended Piping Size
NOTICE
To minimize the amount of refrigerant required, do NOT oversize the piping.
Connect the main pipes between the Liebert XDV branch piping and the Liebert XDP or Liebert XDC according to Table 4. Elbows and restrictions must be minimized to ensure good fluid flow.
Please see Table 4 below for recommended pipe sizes and Figure 3 for piping segment locations.
23