Installation Checklist and System Fill for Startup

8.0INSTALLATION CHECKLIST AND SYSTEM FILL FOR STARTUP

8.1Checklist for Proper Installation

___ 1. Liebert XDV module is properly mounted, secured either to the cabinet, overhead structure or to the Unistruts.

___ 2. Power cords connected to electrical supply.

___ 3. Low voltage wiring to optional condensate detection on Liebert XDV.

___ 4. Piping from Liebert XDP to Liebert XDV, with isolation valves piped to each Liebert XDV.

a.Hard-piped units connected to prefabricated headers

b.Flex piping connections to prefabricated header assembly, if flex piping is used.

___ 5. Piping insulated.

___ 6. Start the Liebert XDV to ensure proper operation (see 9.1 - Start the Liebert XDV).

___ 7. Shut down the Liebert XDV.

8.2Charging with Refrigerant and Starting the Liebert XD System

The Liebert XD System must be completely installed before it is charged with refrigerant. After installation is complete, refer to the Liebert XDP or Liebert XDC user manual for instructions on charging the Liebert XD modules with refrigerant and starting the system. The complete Liebert XD system includes all cooling modules, a Liebert XDC or Liebert XDP unit and any other connected equipment.

33

Page 39
Image 39
Liebert XDV manual Checklist for Proper Installation, Installation Checklist and System Fill for Startup