Liebherr HCB 2062 Planning Information, Door swing clearence - Figure, Unit Dimensions - Figure

Models: HC 2062 HCB 2062

1 17
Download 17 pages 50.41 Kb
Page 4
Image 4
Planning Information

Planning Information

Unit Dimensions - Figure 1

Unit Venting - Figure 3

 

HC/HCB 20 appliances do not require any

 

ventilation openings in the cabinet. The required

 

airflow is directed through the toe kick area.

 

A = 3" (76 mm)

 

B = 79-13/16" (2027 mm)

Figure 1

C = 35-13/16" (910 mm)

D = 3" (76 mm)

 

E = 24" (610 mm)

 

G = 42-7/16" (1078 mm)

 

H = 37-1/8" (943 mm)

Door swing clearence - Figure 2

Please allow for door swing clearance at locations next to a wall.

The illustrated measurement is without mounted front panels. Be sure to add your panel thickness and handle depth to this measurement in order to avoid interferences.

Figure 2

Figure 3

It is important to use the provided cover grille for the ventilation opening. This opening must not be covered with a cabinet base.

4

Page 4
Image 4
Liebherr HCB 2062, HC 2062 Planning Information, Door swing clearence - Figure, HC/HCB 20 appliances do not require any