INSTALLATION

 

A-3

SELECT SUITABLE LOCATION

Work Clamp Installation

 

Locate the welder in a dry location where there is free circulation of clean air into the louvers in the back and out the front of the unit. A location that minimizes the amount of smoke and dirt drawn into the rear louvers reduces the chance of dirt accumulation that can block air passages and cause overheating.

STACKING

SP-125 Plus’ cannot be stacked.

TILTING

Each machine must be placed on a secure, level sur- face, either directly or on a recommended undercar- riage. The machine may topple over if this procedure is not followed.

Attach the work clamp per the following:

1.Unplug the machine or turn the power switch to the “OFF” position.

2.Insert the work cable terminal lug with the larger hole through the strain relief hole in the work clamp as shown in Figure A-3.

3.Fasten securely with the bolt and nut provided.

FIGURE A.3

Strain Relief Hole

Work Cable

Nut & Bolt

OUTPUT CONNECTIONS

Refer to Figure A.2.

1.Work Cable Access Hole.

2.Gun Cable and Control Lead Access Hole.

Work Clamp

Work Cable Installation

3.

Connector Block.

Refer to Figure A.2.

 

 

4.

Gun Trigger Lead Connectors.

1.

Open the wire feed section door on the right side of

5.

Positive (+) and negative (–) output terminals.

 

the SP-125 Plus.

 

 

6.

Wire Feed Gearbox and Gun Connector Block

2.

Pass the end of the work cable that has the termi-

7.

Cable Clamp

 

nal lug with the smaller hole through the Work

 

 

Cable Access Hole (1) in the case front.

8.Thumbscrew - Secures gun and cable assembly

9.Optional Spot/Stitch Timer Kit see Accessories.

FIGURE A.2

WELDING AMP RANGE

25-125

5

4

9

SP-125 Plus

8

+

-

1

2

3

6

7

SP-125 PLUS

Page 11
Image 11
Lincoln Electric IM536-D Select Suitable Location, Stacking, Tilting, Work Clamp Installation, Work Cable Installation