Sequence of operation

Installation & Operation Manual

7 Operating information (continued)

Sequence of operation

 

OPERATION

 

 

 

DISPLAY

 

 

 

 

1.

The manual reset high limit must be closed before any action will

HTR:

Standby

 

take place.

 

 

OUT: 123.8F(129)

2.

Upon a call for heat the control turns on the appropriate pumps

HTR:

Standby

 

(system and boiler pumps for space heating; DHW pump for DHW

 

call). The flow switch and low water cutoff (if equipped) must

OUT: 123.8F(129)

 

close.

 

 

 

 

3.

• If the unit is equipped with a proof

of closure

valve, the

 

 

 

proof of closure switch must be closed. The proof of

 

 

 

closure valve is then energized.

The gas

pressure

 

 

 

switch(es) (if equipped) must close.

 

 

 

 

If the contact for the louvers is closed, the louver proving, HTR: Standby

and auto reset high limit (water heater only) inputs must close. OUT: 123.8F(129)

If the air pressure switch is open, the prepurge cycle then begins by starting the combustion blower. Once started, the air pressure switch must close.

4.After the 15 second prepurge, the blower slows down and the hot HTR: PREPURGE

surface igniter (HSI) is energized. The HSI is heated for at least OUT: 123.9F(129) 20 seconds.

5.Once the HSI is hot, the trial for ignition begins with the HTR: IGNITION

 

opening of the gas valve.

OUT: 123.9F(129)

6.

If the SMART SYSTEM control does not sense flame, then it will

HTR: POSTPURGE, LOCKOUT

 

lock out.

OUT: 123.9F(129)

 

 

 

7.

If the SMART SYSTEM control senses flame, it will fire the burner

 

 

to maintain the set point. The firing rate will stage as required to

HTR: RUN STG: 1

 

hold the actual temperature at the set point. If the boiler lights due

 

to a space heating call for heat, and the ramp delay function is

OUT: 124.8F(129)

 

active (default is disabled), the staging will be held to a series of

 

 

increasing limits after the burner has lit.

 

8.If the space heating call for heat is active, and a DHW call for

heat becomes active, the control will turn on the DHW pump, wait HTR: DHW STG 123

2 seconds, and then turn off the boiler pump. This will divert the OUT: 177.8(180) hot water away from the heating zone(s) and send it to the DHW

tank instead. The control will then modulate to maintain the outlet temperature to the DHW boiler set point.

9.If the DHW call for heat remains active for more than 30 minutes, and the space heating call for heat is also on, then the control will

turn on the boiler pump, turn off the DHW pump after 2 seconds, HTR: RUN STG 12

and resume firing based on the space heating set point. As long OUT: 123.0F(129) as both the space heating and DHW calls for heat remain active,

the control will switch back and forth between the two modes until one of them is satisfied.

10.Once both calls for

heat are satisfied, the control will turn

HTR: POSTPURGE

off the burner. The

blower will remain on for the 30 second

postpurge cycle. Any pumps that are running will continue to run

OUT: 127.4F(129)

for their respective pump delay times, then turn off.

 

 

 

11.Boiler pump off, system pump continues its delay if longer.

HTR: Standby

 

 

OUT: 124.7F(129)

12.System pump off.

 

HTR: Standby

 

 

OUT: 122.9F(129)

OPERATION 55 DISPLAY

Page 55
Image 55
Lochinvar 402 - 2072 operation manual Sequence of operation, Operation, Display, Operating information continued