Lochinvar SCH-I-O operation manual Introduction continued

Models: SCH-I-O

1 44
Download 44 pages 4.32 Kb
Page 5
Image 5
1 Introduction (continued)

1 Introduction (continued)

Before getting started on your installation be sure to carefully read the preparation instructions in this section.

SCH Collectors Installation & Operation Manual

Lochinvar/TiSun Solar Thermal Collectors ￿ CAUTION are not specifically designed for drain back

￿WARNING

Installer – Read all instructions, including this manual before installing. Perform

installations. Consult the factory if drain back utilization is necessary.

NOTICE

￿CAUTION

steps in the order given.

Have your collector(s) serviced/inspected by a qualified service technician, at least annually.

Failure to comply with the above could result in severe personal injury, death or substantial property damage.

When calling or writing about the collector

Please have the collector model and serial number.

Any claims for damage or shortage in shipment must be filed immediately against the transportation company by the consignee.

Factory warranty (shipped with the collector) does not apply to collectors improperly installed or improperly operated.

• You

must

comply

with

local

regulations, laws and standards of the

local governing authority.

 

• The frame must be capable of

withstanding the local snow and wind

loads and permit the correct

anchoring of the collectors in

accordance with all applicable local

regulations.

 

 

 

 

• The load bearing capacity of the

roofing and the frame shall be specially

checked or analyzed by a structural

engineer.

 

 

 

 

 

• The number of mounting brackets

specified

by

the

Lochinvar/TiSun

manuals and parts sheets is based on

an average collector load bearing per

square

foot.

The

maximum

permissible

collector

loading

per

square foot may be calculated from the

number of mounting brackets, taking

into

consideration the

permissible

loading on the mounting brackets. If a

higher collector wind and snow loading

￿CAUTION

The mounting substructure must be capable of withstanding the local snow and wind loads and permit correct anchoring of the collectors.

To avoid damage to the collectors and mounting frames from snow sliding off the roof, additional snow guards must be placed in sufficient numbers around the collectors and above the collectors.

The collectors must be linked with a lightning arrester system and/or the building’s ground system by a licensed electrician.

Hydraulic connection of the collectors must be performed according to Lochinvar/TiSun specifications.

The collector connections must not be damaged,soiledormisaligned. Takecare during transport, installation, and connection of the modules. Do not remove the header protection caps at the top and bottom connections of the collector until just before installation.

When connecting the modules to the riser, the Hydraulic Connection Kit (corrugated pipe) supplied must be installed. Otherwise, the warranty is invalidated.

Always connect the collector outlet and inlet flow to each other diagonally, please follow the connection example (see FIG. 1-1 on page 6).

Do not twist the headers when screwing the connections together. Hold threaded connection in the desired position and tighten clamping ring union nut to torque.

Roof penetrations for solar piping must be adequately sealed against water ingress.

Use only the original sensor well supplied.

Use only high temperature and glycol pipe sealing materials.

(including snow sliding off the roof)

per square foot is required, additional

mounting brackets will have to be

used. Roof pitches in excess of 30° also

represent increased loading; additional

mounting brackets must also be used

for this variant.

￿CAUTION All piping should be properly insulated to avoid freezing and/or burn potential.

5

Page 5
Image 5
Lochinvar SCH-I-O operation manual Introduction continued