Figure 4-25Lifting Rings

SCH Collectors Installation & Operation Manual

4 Collector Installation (continued)

9.Ensure lifting rings are installed and spaced properly per FIG. 4-25.

Figure 4-25Lifting Rings

Figure 4-27Connect Collector to Bottom End Brace< 30° < 30°

6.5 ft.

6.5 ft.

< 30°Figure 4-28Install Top End Brace < 30°

6.5 ft.

8.5 ft.

Figure 4-27Connect Collector to Bottom End Brace

CONNECT COLLECTOR TO BOTTOM END BRACE

SQUARE DISK

HEX BOLT

13.Install the top end brace using the bolt provided in the kit (FIG. 4-28).

14.Connect the collector to the end brace using the square disk and bolt provided in the kit (FIG. 4-28).

15.Ensure all bolts are tightened.

Figure 4-28Install Top End Brace

CONNECT COLLECTOR TO END BRACE

10.Position the collector onto the substructure (FIG. 4-26).

￿WARNING Only loosen the crane connection when the collectors are completely fixed to the

substructure.

Figure 4-26Position Collector On Substructure

16. For side by side installations repeat Steps 1 - 15 and install horizontal hydraulic connections (see FIG. 4-29).

POSITION COLLECTOR

ONTO SUBSTRUCTURE

Figure 4-29Install Horizontal Hydraulic Connections

ENSURE .2”

OVERHANG

11.Connect the collector to the bottom end brace using the square disk and bolt provided in the kit (FIG. 4-27). Do not tighten.

12.Position the collector on the U-channels so that the collector overhangs approximately 5 mm (.2") (FIG. 4-26). Tighten square disk.

NOTICE

The Mechanical Connection Kit is an optional kit available through the manufacturer.

Figure 4-26Position Collector On Substructure 33 Manual background