6 System Start-up (continued)
■Close the fill/flush valve (forward flow) and switch off the filling and flushing pump.
■Open return ball valve (by turning the blue thermometer handle 90°
■The solar system features an air separator. Open the bleeder valve until the solar liquid exits free of air bubbles.
■Only if collector bleeder is installed: Bleed the system on the collector until the solar liquid exits free of bubbles.
■If necessary, increase the test pressure again to 60 psi and check the system for leaks. If the pressure gauge shows the pressure dropping substantially, you have a leak in the system.
■Set the operating pressure to 60 psi as prescribed by the system manufacturer.
■Start up the circulation pump at maximum speed and allow liquid to circulate for at least 15 min.
■Remove the filling station hoses and screw the caps on the flushing and filling valves.
■Check the system again for leaks. Use the red and blue thermometer handles to fully open the forward flow and return ball valves.
■Activate speed control on solar control unit. The highest speed level should be set on the pump (phase control).
Note: The minimum speed set on the solar control unit must not fall below the pump’s minimum nominal speed. Note instructions for pump and solar control unit.
■Once the installation settings have been completed and checked, fit the solar station’s front insulation shell.
■Refer to the collector manufacturer’s recommendations for minimum flow requirements.
Clamp ring screw connections
SCH Collectors Installation & Operation Manual
Flat seal screw connections
■All
Torque levels when tightening flat seal screw connections using AFM 34 flat seals, s = 2mm.
–3/4" screw connection 26 Ft. lb
–1" screw connection 40 Ft. lb
–1 1/4" screw connection 66 Ft. lb
–1 1/2" screw connection 96 Ft. lb
Operation,
■The forward flow ball valve must be open for filling, flushing and bleeding solar systems with a filling and flushing pump. The return ball valve should be closed.
■Both flow checks should be opened in order to bleed the solar system (thermometer handles in 45° position).
■The two
Figure
SETTING FOR OPERATIONS, | DRAINING | SERVICE |
FILLING, FLUSHING, DRAINING | FLOW CHECK OPEN | BALL VALVE |
FLOW CHECK CLOSED | BALL VALVE 1/2 OPEN | CLOSED |
BALL VALVE OPEN |
|
|
Figure 6-2 Return multi-functioning instruments
■Cut the copper pipe to length and deburr.
■First, slide the clamp ring nut over the pipe, then clamp the ring itself.
■Insert the prepared pipe into the screw connection until its stop is reached.
■Tighten clamp ring nut by hand.
■Use
■When tightening the clamp ring screw connection, use two
SETTING FOR OPERATIONS | DRAINING | SERVICE, FILLING FLUSHING | |
FLOW CHECK CLOSED | |||
FLOW CHECK OPEN | BALL VALVE CLOSED | ||
BALL VALVE OPEN | |||
| BALL VALVE 1/2 OPEN |
|