Lucent Technologies 6 manual Testing OpCenter—MCUStatus Board

Models: 6

1 58
Download 58 pages 53.92 Kb
Page 35
Image 35
Testing OpCenter

Adding a Test Conference

Testing OpCenter

To test the OpCenter connection, follow these steps:

1.If the Login window is not already displayed, select StartLucent Tech- nologies CRCSConference Scheduler.

2.From the CRCS Login window, click Login.

3.Enter your login name and password.

4.Click OK.

5.Schedule a test conference to begin immediately and make sure that it downloads to the MCU.

6.From the OpCenter menu on the Main window, select Show.

7.Choose MCU1 or MCU 2 from the drop-down menu (whichever MCU is hosting the scheduled conference).

8.From the MCU Status Board, check to see if the conference appears.

9.Right click on the conference to display the pop-up menu.

10.Select Details to display the Conference Details window.

11.Confirm the test conference settings, bandwidth, convener, sites, etc.

12.Close the Conference Details window and MCU Status Board by clicking the x on the right side of the title bar.

Figure 26. Testing OpCenter—MCU Status Board

Issue 1 CRCS R6.0 April 1999 31

Page 35
Image 35
Lucent Technologies 6 manual Testing OpCenter—MCUStatus Board