Manitowoc Ice Q Pvc Conduit Connection Not Supplied, Typical PVC Conduit Installation, Section

Models: Q

1 28
Download 28 pages 13.75 Kb
Page 15
Image 15
PVC CONDUIT CONNECTION (NOT SUPPLIED)

Section 2

Installation Instructions

Connection to Ice Machine (cont.)

PVC CONDUIT CONNECTION (NOT SUPPLIED)

Connect the ½” PVC conduit from the AuCSA to the ice machine.

Typical PVC Conduit Installation CAUTION

Install 1/2” conduit to protect the tubing and modular wire from damage or access.

NOTE: A pulling elbow is recommended for easier routing of the vinyl tubing and modular wire.

NOTE: AuCS® SHOWN

IS 115 VOLT WITH

POWER CORD

ATTACHED

SV1638G

Typical PVC Conduit Installation

2-7

Page 15
Image 15
Manitowoc Ice Q Pvc Conduit Connection Not Supplied, Typical PVC Conduit Installation, Section, Installation Instructions