Manuals
/
Marathon
/
Kitchen Appliance
/
Trash Compactor
Marathon
RJ-250SC, RJ-88SC, RJ-250VL, RJ-100SC
installation manual
Remote Power Unit
Models:
RJ-250SC
RJ-100SC
RJ-250VL
RJ-88SC
1
11
39
39
Download
39 pages
41.58 Kb
8
9
10
11
12
13
14
15
Troubleshooting
Specifications
Install
Parts list
Charts
RAM Control Timer Adjustment
Wire Sizes
Warranty
Maintenance
Dock Access Gate & Hopper
Page 11
Image 11
1 OPERATION
DECAL PLACEMENT for
RJ-88SC,
RJ-100SC,
RJ-250SC,
or
RJ-250VL
1-9
REMOTE POWER UNIT
Page 10
Page 12
Page 11
Image 11
Page 10
Page 12
Contents
Play IT Safe
Contents
Introduction
Operation
Wastec
Specifications
Side View
Only Authorized Personnel Should be Allowed Inside
PRE-OPERATION Instructions
Control Description for 250VL
Keyed Start Switch Reverse
Operator Station
Emergency Stop Control Description for 88SC, 100SC, & 250SC
Case of Emergency
Manual Override Instructions RAM Stop Rear only RJ-250VL
Operating Instructions for RJ-250VL
Optional Controls
Decals for RJ-88SC, RJ-100SC, RJ-250SC, or RJ-250VL
Remote Power Unit
Security Chute
Optional Loading Configurations
Dock Access Gate & Hopper
THRU-THE-WALL
Rear View
Hydraulic Tailgate HT Units
LOCK-OUT & TAG-OUT Instructions
Maintenance
Periodic Maintenance
Setting
Procedures
Pressure Setting
Pressure Settings Relief
Printe D Circuit Board Locate D I N Motor Control Panel
RAM Control Timer Adjustment
RAM Stop Forward Option
MULTI-CYCLE Timer Adjustment Option
Warranty and Service on Motors
Cylinder Removal Instructions
Principles of Operation
Standard System Operating CHARACTERISTICS, 5 hp & 10 hp
Section A-A
Tailgate Seal Replacement
Front View
Door Seal on Door
Fuses and Circuit Breakers
Charts
Timer Settings
Length Size
Wire Sizes
Part Description
Parts List
Motor Control Panel Typical
Power Unit Standard 5 HP
Power Unit Standard 10 HP
Hydraulic Schematic Typical
Problem Cause Solution
TROUBLE-SHOOTING Chart
Pump Makes NOISE-SOUNDS
Container Guides
Concrete PAD Requirements
Concrete PAD
Decals
Steel Installation Procedures
Dock Installation
CHUTE-FED Installation
Remote Power Pack Installation
Electrical & Hydraulic Installation
START-UP Instructions
Pushbutton Operator Station
Electrical Connections
TOP View Compactor
THROUGH-THE-WALL Power Unit Installation
Power Unit
See the Next page for Door and Latch Operation Instructions
Hauler Instructions General
Latch Side View Container
Hauler Instructions DOOR/LATCH Operation
Auto Relatch
For Optional HT Units
Body Between the Tailgate and the Container
Instructions for Using Maintenance BAR
Hauler Instructions Liquid Removal For Optional SL Units
Top
Page
Image
Contents