3.3.Installation and Line processing of Speaker

Putting of speaker fixation ring

Speaker Fixation Ring

Put according to 4 ribs.

Processing of speaker cable

Solder

Match case sign to the center in the terminal of the speaker.

22.5mm From the rib to the terminal

Black line

Red line

Speaker Cable

The double coating part of

the cable according to the ditch of the case

The cable is not loosening between the rib and the pin.

Putting of speaker box

Touch the boss

Putting of speaker box

Touch the Case’s wall

3.4.Assembly of Touch Pad

Insertion of PAD FFC

Installation of pad button

 

PAD FFC is

Puted in the gasket

 

ditch

 

inserted in the

PAD FFC

 

connector.

 

 

Inserted in the

 

(Direction where

 

positioning pin

 

the reinforcement

 

 

 

version is seen)

Pad button

 

 

 

Touch Pad

 

Putting of PAD sheet

This line must become vertical

PAD sheet

After putting of the PAD sheet, the Flaking off paper is peeled off

Latch is inserted in the top case(4 places)

Sets in the dent

Putting of touch pad

 

Putting of pad cover

The hooks are hooked

Pin for positioning

The touch pad is put

Touch Pad

It is confirmed that all LED lenses fit in the hole of the pad cover

Pad Cover

The hooks are inserted

3-4

Page 20
Image 20
Matsushita CF-T4GWCTZ1 2 service manual Installation and Line processing of Speaker, Assembly of Touch Pad