MGE UPS Systems 800 Rack, 1500 Rack, 1100 Installation of the communications-card option

Models: 500 Rack 800 Rack 1500 Rack 1100 1100 Rack 1500

1 196
Download 196 pages 60.21 Kb
Page 18
Image 18

2. Installation

2.6 Installation of the communications-card option

4

1

- Remove the slot cover 4 secured by

 

two screws.

Restricted-access slot for

2

- Insert the card in the slot.

the communications card

 

 

 

3

- Secure the cover with the two screws.

RS232

DATA LINE PROTECTION

IN OUT

It is not necessary to shut down the UPS to install the communications card.

This operation must be carried out by qualified personnel.

34007117EN/AB - Page 17

Page 18
Image 18
MGE UPS Systems 800 Rack, 1500 Rack, 1100 Rack manual Installation of the communications-card option