Miller Electric DVI-2 R manual Duty Cycle And Overheating, Minutes

Models: DVI-2 R

1 48
Download 48 pages 59.55 Kb
Page 16
Image 16

.A complete Parts List is available at www.MillerWelds.com

4-2. Duty Cycle And Overheating

A. 115 VAC

Duty Cycle is percentage of 10 minutes that unit can weld at rated load without overheating.

If unit overheats, thermostat(s) opens, output stops, and cooling fan runs. Wait fifteen minutes for unit to cool. Reduce amperage or duty cycle before welding.

NOTICE − Exceeding duty cycle can damage unit or gun and void warranty.

20% duty cycle at 90 amps

2 Minutes Welding

8 Minutes Resting

B. 230 VAC

40% duty cycle at 150 amps

4 Minutes Welding

6 Minutes Resting

Overheating

 

0

A or V

 

15

 

OR

Minutes

Reduce Duty Cycle

 

duty1 4/95 − 124 655 / 220 896-A

OM-232 386 Page 12

Page 16
Image 16
Miller Electric DVI-2 R manual Duty Cycle And Overheating, 40% duty cycle at 150 amps Minutes Welding Minutes Resting