Mitsubishi MN Converter, G-50A manual Ending the graph, Screen function and operation

Models: G-50A MN Converter

1 69
Download 69 pages 23.88 Kb
Page 37
Image 37
(2) Screen function and operation

2)Clicking (3) Ending the graph returns to Trend Graph Screen

displaying the horizontal grid line in the number being

set to the graph.Manual background

(e)Starting the graph

Clicking Manual background initiates monitoring to graph the data for each one minute. The sampling time to allow graphing by online system is limited to 500 minutes maximum. If 500 minutes are exceeded, the data of old time is eliminated by the excess time.

(3)

(2) Screen function and operation

[Graph number]

 

-The current monitor data is displayed on [Lower column].

-Clicking [Graph number] makes the graph line bold.

-[Current time] is displayed.

-Clicking Manual background suspends the monitoring.

At suspension, [Scaler] will be displayed on the graph. Dragging the scaler displays the data on the scaler at the current value column and [Time] at the under part of the graph number.

- Moving [Scroll bar] by dragging or clicking Manual background moves the display range of the graph.

Manual background can be operated as same as the local remote controller.

[Refer to 3.10 Operation control.]

* Here, BC operation cannot be carried out.

-Clicking Manual background clears the graph being displayed. The set values of the graph setting items and other setting items will remain unchanged.

(3) Ending the graph

To finish Trend Graph Screen and return to Operation Status Monitor Screen, click [Return] on the

menu bar or click Manual background . A message of [Finish the trend graph and return to the monitor?] will be

displayed. For returning, click Manual background, while not returning, click . Clicking Manual background returns to Operation Status Monitor Screen.

36

Page 37
Image 37
Mitsubishi MN Converter, G-50A manual Ending the graph, Screen function and operation