VERTICAL TERMINATION CONFIGURA- TIONS

CSDV Series Direct Vent Gas Stove

Venting installation

Cut Hole 1/8" Larger than Support Box when Projected Flat Ceiling Installation, Page 19 and above. onto Roofline

Cathedral Ceiling Support Box

2" Minimum

Below Finished

Ceiling

ST1142

VERTICAL TERMINATION CONFIGURA- TIONS

Figures 29 through 31 show four different configurations for vertical termination.

IMPORTANT: Install restrictor as indicated on chart (Figure

13)on Page 14.

Figure 27 -

Cathedral Ceiling Support Box Installation

3. Lower the support box through the hole in the roof until

the bottom of the box extends at least 2" ( mm) below

the ceiling. Figure 27. Align the support box vertically

and horizontally using a level. Temporarily tack the sup-

port box in place through the inside walls and into the

roof sheeting.

4. Using tin snips, cut the support box from the top corners

down to the roofline and fold the resulting flaps over the

roof sheeting. Figure 28. Apply a bead of non-hardening

mastic around the top edges of the support box to make

a seal between the box and the roof. Nail in place with

roofing nails. Remove any combustible material that

H1

NOTE: Install restrictor into 4" collar of stove or first vent section as shown.

H

might be inside the support box.

5. Complete the cathedral ceiling installation by following

the same procedures outlines in Steps 2 through 6 for

Flat Ceiling Installation, Page 19 and above.

ST1143

V

Manual backgroundManual backgroundST1145

Figure 28 -

Installed Cathedral Ceiling

Support Box

Apply Non-hardening Mastic Under all Edges of Support Box Before Nailing

Table 5 - Venting with Three (3) 90° Elbows

Maximum

 

Vertical

 

Horizontal

Minimum

Minimum

Minimum

(H + H1)

CSDV20 (V)

CSDV30 (V)

CSDV40 (V)

24"

41Z\x"

52Z\x"

54Z\x"

(610 mm)

(1054 mm)

(1334 mm)

(1384 mm)

20'

95Z\v"

98C\v"

102Z\v"

(6 m)

(2419 mm)

(2508 mm)

(2597 mm)

 

 

 

 

Figure 29 -

Vertical Rigid Venting Configuration using Three

(3) 90° Elbows with Two (2) Horizontal Runs

20

58D6056

Page 20
Image 20
Monessen Hearth CSDV20SLP Vertical Termination Configura- Tions, CSDV Series Direct Vent Gas Stove, Venting installation

FAQ

What is the minimum distance required below the finished ceiling for the Cathedral Ceiling Support Box installation?

The bottom of the box should extend at least 2" below the ceiling.

How should I align the support box vertically and horizontally during installation?

Use a level to align the support box. Temporarily tack the support box in place through the inside walls and into the roof sheeting.

What material should be used to make a seal between the support box and the roof?

Apply a bead of non-hardening mastic around the top edges of the support box to make a seal between the box and the roof.