Moyer Diebel MH-6NM2, MH-60M2, MH-6LM2 Initial Start-Up, Complete the installation, C A D B F E

Models: MH-6LM2 MH-60M2 MH-6NM2

1 68
Download 68 pages 47.65 Kb
Page 18
Image 18
INITIAL START-UP

INITIAL START-UP

INITIAL START-UP

Complete the installation

After plumbing and electrical connections are made, follow the steps below to complete the installation of your dishwasher.

1.Remove the white protective covering from the exterior of the machine.

2.Remove any foreign material from inside the machine.

3.Make sure dishwasher power switch is off.

4.Turn main water supply on.

5.Turn main power on at the main power service disconnect switch.

1

Install the Scrap Screens

and Drain-Overflow Assembly

Install scrap screens. Make sure rubber stopper is secure on the drain- overflow assembly.

Make sure the drain-overflow seats securely in the

tank bottom.

MAKE SURE DOORS

ARE FULLY CLOSED.

2

The controls are located

on the front of the dishwasher. A- On/Off power switch

B- Power indicator Light C- In cycle light

D- Extended wash switch E- Final rinse

pressure gauge F- Wash water

temperature gauge

C

A

D

B

F

E

16

Page 18
Image 18
Moyer Diebel MH-6NM2 Initial Start-Up, Complete the installation, Install the Scrap Screens and Drain-Overflow Assembly