Moyer Diebel MH-6NM2 Check Final Rinse Water Temperature, Check Final Rinse Water Pressure

Models: MH-6LM2 MH-60M2 MH-6NM2

1 68
Download 68 pages 47.65 Kb
Page 21
Image 21
Check Final Rinse

INITIAL START-UP

INITIAL START-UP (Cont.)

8

Check Final Rinse

Water Temperature

Check the final rinse water temperature during the final rinse cycle.

The final rinse water temperature gauge is located in the final rinse piping at the top of the dishwasher.

The final rinse water tempera- ture should be a minimum of

180°F/82°C for (MH-60, MH-6N). The optimum final rinse temperature for (MH-60, MH-6N) is 180-195°F/82-91°C.

The MH-6L requires a minimum final rinse temperature of 120°F/49°C.

However, a minimum final rinse temperature of 140°F/60°C is optimum for the MH-6L.

9

Check Final Rinse

Water Pressure

The final rinse water pressure gauge should indicate a flowing pressure of 20-22 PSI/138-151.8 kPa during the final rinse cycle for all models.

A pressure reducing valve (PRV) is required if flow pressure exceeds 20-22 PSI/138-151.8 kPa.

19

Page 21
Image 21
Moyer Diebel MH-6NM2, MH-60M2 Check Final Rinse Water Temperature, Check Final Rinse Water Pressure, INITIAL START-UP Cont