10
cFP-20xx Quick Start Guide ni.com
C. Use a separate power supply for each module that needs external power.
D. Refer to the operating instructions for the power requirements of each I/O module. If a
module requires external power, connect a power supply to the V and C inputs on the
connector block for that module. If you want to power field I/O devices from a connector
block, supply power to the connector block, and then connect the connector block V and C
output terminals to the field device.
CCAAUUTTIIOONNCascading power defeats isolation between the cascaded modules.
PPoowweerriinngg UUpp tthhee ccFFPP--2200xxxx
Check the DIP switches
on the controller, making
sure that the RESET IP
switch is not enabled.
Plug in each power
supply to the Compact
FieldPoint system. The
cFP-20
xx
runs a power-on
self test (POST) that takes
several seconds. You should see the POWER and STATUS LEDs come on. After about five
seconds, the STATUS LED begins flashing. The cFP-20
xx
is ready to be configured, and you
can install the FieldPoint software.
If you have already assigned an IP address to the cFP-20
xx,
the STATUS LED turns off, and
the A, B, C, and D LEDs come on for about 15 seconds as LabVIEW RT starts up. Once they
turn off, the I/O module READY LEDs come on, and the cFP-20
xx
is ready for use. The total
boot time for a configured system is 30–45 seconds.
If the STATUS LED does not light up as described here, refer to the
cFP-20xxand cFP-BP-x
User Manual.
7
12345
687
ON
DDIIPPSSwwiittcchheessFFuunnccttiioonnss
1, 2 . . . . . . . . . .User-configurable on cFP-2000 and
cFP-2010; disabled on cFP-2020
3, 4, 5 . . . . . . . .User-configurable
6 . . . . . . . . . . . .DISABLE VI
7 . . . . . . . . . . . .SAFE MODE
8 . . . . . . . . . . . .RESET IP