\
\/
/
\
/
\/
\
Sfep 1 4
A.Affach four PARAGLIDESTRIPS /50) inside fhe end of fhe RECEIVING TUBE (17), and four PARAGLIDESTRIPS (50) outside the end of he PRESSADJUSTMENTTUBE I12) using
following steps:
*Thoroughly clean all surfaces where the PARAGLIDESTRIPS (50 / are to be aftached.
*Remove the PARAGLIDESTRIPS (50) from the paper backing and firmly apply them to all shown surfaces.
B.Carefully slide the PRESSADJUSTMENTTUBE (12) into the RECEIVING TUBE (17). (MAKE SURE SPRING PIN BARREL ON THE RECEIVING TUBE (17) IS ON THE SAME SIDE AS THE HOLES
IN THE PRESS ADJUSTMENTTUBE)
C.Insert two 1/2 IN. FLANGE BEARINGS(95) into the PRESSLEVER (15) as shown on drawingZ
D.Assemble the PRESS ADJUSTMENTTUBE (12) to the PRESSLEVER (15) as shown on drawing, using 1/2 X 4 IN. BOLT (66), fwo 1//2 IN. WASHERS(65), and one 1/2 IN; LOCKNUT (90).
(TIGHTEN THE CONNECTIONENOUGHTO REMOVETHE PLAY, YET ALLOWINGTHE RECEIVING TUBE (17) TO ROTATEFREELY)
16