Step1 7

A.Assemble three 2 IN. PULLEYS (43) to the L-HOOKS on the TOP BOOM(5), us shown, and SECURE piece with two 1/4 IN. CAP NUTS (87).

Step1 8

A. SECURELYassemble the BEARING HOUSING(18) and the CENTER PULLEY BRACKET(10) fo the FRONT UPRIGHT (22) as shown oq drawing, using

two 1,/2 X 3-1/2 IN. BOLTS (68) , four 1/2 IN. WASHERS(63), and two 1/2 IN. LOCK NUTS (90).

(THE CONNECTORPLATES ON THE BEARING HOUSING AND THE CENTER PULLEY BRACKETHAVE SLOTTEr) HOLES, SHIFT THE BEARING HOUSING DOWNAND THE CENTER PULLEY BRACKET UP AS FAR AS POSSIBLE)

B. Attach two 1 X t IN. GUIDES(4i5) to the

ANGLE on the BEARING HOUSING (18).

1/2

I

1/2

I

1/2

 

 

 

 

1

~ I

I 2

I

I I

 

 

 

I

Page 18
Image 18
ParaBody 425 manual