NOTD MAKE SURE CABLE RUNS OVER

OVER THE TOP OF THE BOLTS,

LAT

CA]~LE

(CONTINUED FROM PREVIOUSPAGE)

*Run the LAT CABLE(112) through fhe BASE PULLEY (~s shown in druwing detoil.

*Run the LAT CABLE (112) through fhe hole of the D-RING (28) c~s shown, at~ch one KEYHOLECLEVIS (61) to the end of the LAT CABLE (112).

*Replace and SECURELY-lighten fhe two PULLEY and two BOLT connecfions from the previous sfeps. (IMPORTANT: MAKE SURE THE LAT CABLE RUNS OVER THE TOP OF THE BOLTS IN THE TOP BOOM

6 Id . I

Page 24
Image 24
ParaBody 425 manual Lat Ca~Le