NOTD MAKE SURE CABLE RUNS OVER
OVER THE TOP OF THE BOLTS,
LAT
CA]~LE
(CONTINUED FROM PREVIOUSPAGE)
*Run the LAT CABLE(112) through fhe BASE PULLEY (~s shown in druwing detoil.
*Run the LAT CABLE (112) through fhe hole of the
*Replace and
6 Id . I
NOTD MAKE SURE CABLE RUNS OVER
OVER THE TOP OF THE BOLTS,
*Run the LAT CABLE(112) through fhe BASE PULLEY (~s shown in druwing detoil.
*Run the LAT CABLE (112) through fhe hole of the
*Replace and
6 Id . I