Chapter 2

Preparation

 

Chapter contents

 

 

Completing a configuration worksheet

20

DialFire Basic BRI Configuration Worksheet

21

DialFire PTE Configuration Worksheet, Channelized T1, Long Haul (External T1)

22

DialFire Channelized T1, Short-Haul Configuration Worksheet

23

DialFire PTE ISDN E1 (Euro ISDN) Configuration Worksheet

24

DialFire PTE ISDN T1 (PRI), Long-Haul (External T1) Configuration Worksheet

25

DialFire ISDN T1 (PRI), Short-Haul Configuration Worksheet

27

19

Page 19
Image 19
Patton electronic 2977 manual Preparation, Chapter contents