Manual background

5

6

7

8

Remarks

1Offset voltage/Master clock must be adjusted in the product condition.

2Input signal must be CD- Manual backgroundsignal. 23 tracks of test disc(YEDS-7)

3The adjustment for offset voltage/master clock must be done within 2 or 3 minutes from the start of product operation.

4Master clock must be adjusted using high-frequency probe.

5The measuring points for adjusting offset voltage must be as follows:

Sensing pin land : AL2 or its equivalent land and GND

Sensing pin land : AR2 or its equivalent land and GND

Sensing pin land : BL2 or its equivalent land and GND

Sensing pin land : BR2 or its equivalent land and GND

6The measuring points for adjusting master clock must be as follows: TP3001 or its equivalent land and TP3002 or its equivalent GND

A

B

C

D

E

F

5

6

 

 

 

 

 

 

RS-A9/EW

 

 

107

 

 

 

7

8

 

Page 107
Image 107
Pioneer RS-A9/EW manual