5 | 6 | 7 | 8 |
Remarks
1Offset voltage/Master clock must be adjusted in the product condition.
2Input signal must be CD- signal. 23 tracks of test
3The adjustment for offset voltage/master clock must be done within 2 or 3 minutes from the start of product operation.
4Master clock must be adjusted using
5The measuring points for adjusting offset voltage must be as follows:
Sensing pin land : AL2 or its equivalent land and GND
Sensing pin land : AR2 or its equivalent land and GND
Sensing pin land : BL2 or its equivalent land and GND
Sensing pin land : BR2 or its equivalent land and GND
6The measuring points for adjusting master clock must be as follows: TP3001 or its equivalent land and TP3002 or its equivalent GND
A
B
C
D
E
F
5 | 6 |
|
|
|
|
|
| |
|
| 107 | ||||
|
|
| 7 | 8 | ||
|