9. Pre-defined System Functions

Power-up action

After the power is first applied to a dome it will perform a self-test procedure. This calibrates and checks the basic functions of the dome. External controls are overruled during this self-test period.

After the self-test, the PTZ camera will be ready for control. If the device was running the Auto-pan function before power was broken, the speed dome will retrieve Auto Scan function until new control is given by an operator.

Tour group

The speed dome software automatically groups the first 16 presets into 4 tour groups. i.e. presets 1 ~ 4 is owned by group 1; Preset number 5 to 8 belong to group 2… etc.

When tour function is initiated, the P/T mechanism will start scanning automatically around all the presets included in the group.

How to initiate tour function is subject to controllers.

.

.

User’s manual

45