Step 3.

For installations using a round support box/wall thimble (check pipe manufacturer's instructions), mark the wall for a 10 in. x 10 in. (254mm x 254mm) square hole. The center of the square hole should line up with the center line of the horizontal pipe, as shown in Figure 5.5. Cut and frame the hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, i.e. masonry block or concrete, a 7 in. (178mm) diameter hole is acceptable.

CENTER OF

HOLE

CENTER

LINE

WALL

CENTER

LINE

THIMBLE

 

 

 

CENTER OF

HOLE

CENTER

LINE

CENTER LINE

WALL

THIMBLE

Wall Thimble

14 in. (356mm) Pipe Length

Max. Wall Depth = 10 in. (254mm)

1 in. (25mm) Clearance from stove corner to combustible wall.

45° Elbow

1 in. (25mm) Clearance from stove corner to combustible wall.

45° Elbow in Corner Installation

When installing the Sapphire in a rear vent configuration with no vertical rise: a Snorkel Kit must be used, and a derating orifice must be installed. The appropriate orifice is supplied with the Rear Vent Kit.

Figure 5.5

NOTE:

(1)Installation requires a minimum of 11 in. (279mm) horizontal run. Each 1 ft. (305mm) of horizontal vent run must include a 1/4 in. (6mm) of vertical rise towards the termination. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a house or structure fire.

(2)The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be easily blocked or obstructed, see Figure 4.4 on page 9.

(3)For installations requiring a vertical rise on the exterior of the building, the HHT RHVK snorkel kit (Part #844- 8921) is available with a 14 in. (356mm) and a 36 in. (914mm) tall snorkel termination cap. Follow the same installation procedures as used for standard horizontal terminations. If the snorkel termination must be installed below grade (i.e. basement application), proper drainage must be provided to prevent water from entering the snorkel termination. Do not backfill around snorkel termination.

Step 4.

Position the horizontal termination cap in the center of the 10 in. x 10 in. (254mm x 254mm) square hole and run a bead of non-hardening mastic around its outside edges, so as to make a seal between it and the wall, attach termination cap to the exterior wall with the four wood screws provided. The arrow on the vent cap should be pointing up (Figure 5.6).

WOOD

SCREW

PART HHW2 PART 841-0670 (Preferred)

WALL THIMBLE

Figure 5.6

NOTES:

(1)The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

(2)Termination cap HHW2 (Part #841-0670) is highly recommended on a building with vinyl siding, as the vinyl siding standoff is built in. The pilot hole will be 2 in. (51mm) closer to the bottom of the square than the top. Using a framing square, draw a 14 in. x 14 in. (356mm x 356mm) square around the pilot hole in the siding. See Figure 5.7 on the next page.

January 28, 2008

Quadra-Fire · Sapphire · 250-7233E

Page 13

Page 13
Image 13
Quadra-Fire SAPPH-D-CSB, 839-1460, SAPPH-D-CWL, 839-1390, 839-1440 owner manual Elbow in Corner Installation