2. Top Vent - Vertical Termination - (continued)
Three Elbows | VT Min. | HT Max. | |
1 ft. 6 in. | 3 ft. | ||
| |||
Note: A section of vertical pipe (12 inches minimum) | 2 ft. 6 in. | 6 ft. | |
|
| ||
MUST be installed prior to attaching a 90° elbow. | 3 ft. 6 in. | 9 ft. | |
| 4 ft. | 10 ft. | |
| 4 ft. 6 in. | 12 ft. | |
| 5 ft. 6 in. | 15 ft. | |
| 6 ft. 6 in. | 18 ft. | |
| 7 ft. 6 in. | 21 ft. | |
| HT = 21 ft. Max |
| |
| VT = 40 ft. Max |
| |
| VT + HT = 30 ft. Max* | ||
| * If the horizontal component is less than | ||
| 5 feet then the total vent run can be | ||
| extended to 40 feet. |
|
V2
VT
HT
H1
H2 | V1 |
INSTALLED
HORIZONTALLY
Figure 5.8
17 |