Chapter 12 StorNext Reports
The Scheduler Information Report
StorNext User’s Guide 290
Window: If StorNext was down at the time of the scheduled event
and is restarted during the window time period, the event is
launched; otherwise it is skipped until the next scheduled time
Last Run: The time the schedule was last run
Use the following procedure to run the Scheduler report.
1Choose Scheduler from the Reports menu. The Scheduler Report
screen appears.
Figure 220 Scheduler Report
Screen