Manuals
/
Raypak
/
Household Appliance
/
Water Heater
Raypak
503-2003 manual Models
Models:
503-2003
1
40
56
56
Download
56 pages
27.2 Kb
37
38
39
40
41
42
43
44
<
>
Troubleshooting
Install
WIRING DIAGRAMS - Models
Filter Replacement
Warranty
Maintenance
Exhaust Configuration
Field Wiring Connection
Mode 5 - Outdoor reset using primary/secondary pip- ing. The heater is operated as in Mode 2. However, the target temperature is based on outdoor reset. See Fig
UDB Diagnostic Board
Page 40
Image 40
Mo
d
e
l
s
1
753–2003
40
Page 39
Page 41
Page 40
Image 40
Page 39
Page 41
Contents
INSTALLATION & OPERATING INSTRUCTIONS
Models 503-2003 Types H & WH
Rev. 8 reflects the following
CONTENTS
WARNINGS
Pay Attention to These Terms
BEFORE INSTALLATION
Installations at Elevation
Product Receipt
Model Identification
Component Locations
General Information
Fig. 1 Component Locations - Side
Fig. 2 Component Locations - Front
GENERAL SAFETY
Time/Temperature Relationships in Scalds
Water
Time to Produce Serious
INSTALLATION
Installation Codes
Equipment Base
Clearances
Combustion and Ventilation Air
Service
Heater
Min. Clearance
Canadian Installations2
U.S. Installations1
Table E Vent/Air Inlet Termination Clearances
Conventional Combustion Air Supply
U.S. Installations
Air Filter
Direct Vent
Canadian Installations
Water Piping
General
Temperature & Pressure Gauge
Relief Valve Piping
Hydrostatic Test
Cold Water Operation
Hydronic Heating
Pump Selection
Feedwater Regulator
Cold Water Starts
Model
Min. Flow
Max. Flow
P ft
Three-WayValves
Domestic Hot Water
Potable Water and Space Heating
Pool Heating
1.Turn on pump
Winterizing Your Heater
Recommended Levels
Fiberglass Pools
Fiberglass Spas
Gas Supply
Gas Supply Connection
Gas Supply Pressure
Automatic Chlorinators and Chemical Feeders
Electrical Power Connections
Natural Gas
Field-ConnectedControllers
Check the Power Source
Making the Electrical Connections
Field Wiring Connection
Venting
DANGER SHOCK HAZARD
Appliance Categories
Exhaust Configuration
U.S. Installations
Combustion Air Supply
Heater Venting Category
Venting Installation Tips
Venting Configurations
Canadian Installations
Installation
Termination
Volume of
Common Venting
Vent
Model
Installation
75’ of straight flue pipe
Installation
Model
Certified
Combustion Air
Outdoor Installation
Termination
Freeze Protection
Controls
Operating Modes
Mode 5 - Outdoor reset using primary/secondary pip- ing. The heater is operated as in Mode 2. However, the target temperature is based on outdoor reset. See Fig
Mode 8 - This mode is for remote firing control of the heater via an external sequencer such as the Raypak TempTracker MOD+. The Boil Max setting is the heater shutdown temperature max temperature. The heater is enabled via dry contact at the Enable/Disable connection at the low voltage terminal strip, and the fir- ing rate is controlled by a 0-10VDC signal from the external sequencer. A control signal of ≥0.5 VDC equates to minimum fire, and a signal of 10 VDC equates to 100% firing rate. See Fig
Default Setting
0-10VDC
0-20mA
2-10VDC
Definitions
Fault Description
Rank
Number Field
Type
Heater Sequence of Operation
High Limit-ManualReset
Ignition Module
Code
High Limit-AutoReset Optional
Modulating Temperature Control
Flow Switch
High & Low Gas Pressure Switches Optional
Blocked Vent Switch
Air Pressure Switch
UDB Diagnostic Board
WIRING DIAGRAMS - Models
Models
START-UP
Pre Start-up
Pre Start-upCheck
Initial Start-up
Preparation
Start-Up
Check Power Supply
Attach Manometers to Measure Pressures
Setting
Setting in. WC
Setting
Manifold Gas Pressure Setting
Leak Test Procedure Dual-SeatGas Valve
Follow-Up
OPERATION
Lighting Instructions
To Turn Off Gas To Appliance
TROUBLESHOOTING
Step Step Step
Step
Step Step
UDB Fault History
MAINTENANCE
Suggested Minimum Maintenance Schedule
Preventive Maintenance Schedule
Periodically
Daily
Weekly
Filter Replacement
Filter Maintenance
As Required
APPENDIX
Inside Air Contamination
248 CMR 5.082a1 through
LIMITED PARTS WARRANTY MVB - TYPES H AND WH
HEAT EXCHANGER WARRANTY
ADDITIONAL WARRANTY EXCLUSIONS
PARTS REPLACEMENT
START-UPCHECKLIST FOR FAN-ASSISTED
RAYPAK PRODUCTS
EMISSIONS SETTINGS AND TEST INFORMATION
Nominal Factory Recommended Settings