Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
5042004 operating instructions WIRING DIAGRAM - Models P & WHP
Models:
5042004
1
41
56
56
Download
56 pages
50.66 Kb
38
39
40
41
42
43
44
45
<
>
Troubleshooting
Install
WIRING DIAGRAM - Models H & WH
Filter Replacement
Warranty
Maintenance
Configuration
Field Wiring Connection
High Limit—ManualReset
UDB Diagnostic Board
Page 41
Image 41
WIR
IN
G DIAGRAM
- Models P & WHP
41
Page 40
Page 42
Page 41
Image 41
Page 40
Page 42
Contents
Models 504–2004 Types H, WH, P & WHP
INSTALLATION & OPERATING INSTRUCTIONS
Rev. 5 reflects the following
CONTENTS
Pay Attention to These Terms
WARNINGS
Installations at Elevation
BEFORE INSTALLATION
Product Receipt
Model Identification
General Information
Component Locations
Fig. 1: Component Locations – Side
Fig. 3: Component Locations – Rear
Time/Temperature Relationships in Scalds
GENERAL SAFETY
Water
Time to Produce Serious
Installation Codes
INSTALLATION
Equipment Base
Clearances
Service
Combustion and Ventilation Air
Heater
Min. Clearance
Table E: Vent/Air Inlet Termination Clearances
U.S. Installations1
Canadian Installations2
U.S. Installations
Conventional Combustion Air Supply
Air Filter
Direct Vent
General
Water Piping
Canadian Installations
Relief Valve Piping
Temperature & Pressure Gauge
Hydrostatic Test
Cold Water Operation
Pump Selection
Hydronic Heating
Feedwater Regulator
Cold Water Starts
Input
Model
Output
20 ∆T
Domestic Hot Water
Three-WayValves
Potable Water and Space Heating
Pool Heating
1.Turn on pump
Recommended Levels
Winterizing Your Heater
Fiberglass Pools
Fiberglass Spas
Gas Supply Connection
Gas Supply
Gas Supply Pressure
Automatic Chlorinators and Chemical Feeders
Model
Electrical Power Connections
1 in. NPT
1-1/4in. NPT
Making the Electrical Connections
Check the Power Source
Field-ConnectedControllers
Venting
Field Wiring Connection
DANGER: SHOCK HAZARD
Appliance Categories
U.S. Installations
Configuration
Combustion
Exhaust
Venting Configurations
Venting Installation Tips
Canadian Installations
Installation
Certified
Model
Vent Size
Vertical Vent
Common Venting
Volume of
Engineered Vent Systems
Model
Vent Size
Installation
Installation
Direct Vent—Vertical
Termination
Model
Outdoor Installation
Certified
Combustion Air
Freeze Protection
Controls
Operating Modes
Boiler Target
0-10VDC
0-20mA
4-20mA
Definitions
2-10VDC
Default Setting
Default Setting
Boiler H7
Modes
Water Heater WH1
Default Setting
Item
Modes
Item
Fault Description
Rank
Number Field
High Limit—ManualReset
Heater Sequence of Operation
Ignition Module
Code
Flow Switch
High Limit—AutoReset Optional
Modulating Temperature Control
High & Low Gas Pressure Switches Optional
UDB Diagnostic Board
Blocked Vent Switch
Air Pressure Switch
WIRING DIAGRAM - Models H & WH
WIRING DIAGRAM - Models P & WHP
Pre Start-up
START-UP
Pre Start-upCheck
Initial Start-up
Check Power Supply
Start-Up
Attach Manometers to Measure Pressures
FOR REFERENCE ONLY: Measure the blower
Setting in. WC
Setting
Setting
Manifold Gas Pressure Setting
Post Start-UpCheck
Leak Test Procedure: Dual-SeatGas Valve
Lighting Instructions
OPERATION
To Turn Off Gas To Appliance
UDB Fault History
Step Step Step
TROUBLESHOOTING
Step
Step Step
Preventive Maintenance Schedule
MAINTENANCE
Suggested Minimum Maintenance Schedule
Weekly
Filter Maintenance
Monthly
Semi-Annually
Inside Air Contamination
Filter Replacement
APPENDIX
248 CMR 5.082a1 through
HEAT EXCHANGER WARRANTY
LIMITED PARTS WARRANTY MVB – TYPES H AND WH
ADDITIONAL WARRANTY EXCLUSIONS
PARTS REPLACEMENT
HEAT EXCHANGER WARRANTY
LIMITED PARTS WARRANTY MVB – TYPES P & WHP
ADDITIONAL WARRANTY EXCLUSIONS
PARTS REPLACEMENT
RAYPAK PRODUCTS
START-UPCHECKLIST FOR FAN-ASSISTED
EMISSIONS SETTINGS AND TEST INFORMATION
Nominal Factory Recommended Settings