DANGER: SHOCK HAZARD
Make sure electrical power to the heater is discon- nected to avoid potential serious injury or damage to components.
Fig. 21: Wiring Connections
Installer action is required to electrically enable your heater to operate after making the power connections. You must make a closed contact connection on Stage 1 connector of the Central Point Wiring (CPW) board for temperature control connections. This will be done based on the controller option selected with your heater order.
1.For Pool and
2.For
3.For
Heater must be electrically grounded in accordance with the NEC, and CSA C22.1 C.E.C. Part 1 in Canada.
TANKSTAT
STAGE 1 |
|
|
|
| STAGE 2 CONNECTION OR |
|
|
|
| ||
|
|
|
| ||
|
|
|
| ||
|
|
|
| ||
|
|
|
| STAGE 1 CONNECTION | |
CONNECTION |
|
|
|
| |
|
|
|
| OF HEATER 2 | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
ATTACH STAGE 1 CONNECTIONS ON HEATER
TO STAGE 1 CONNECTION ON TANKSTAT.
ATTACH STAGE 2 CONNECTIONS OR
STAGE 1 CONNECTION OF HEATER 2
TO STAGE 2 CONNECTIONON TANKSTAT
AS SHOWN IN THE DIAGRAM.
Fig. 22:
24