
DANGER: SHOCK HAZARD
Make sure electrical power to the heater is discon- nected to avoid potential serious injury or damage to components.
Fig. 21: On-Off Wiring Connections
Fig. 22: 2-Stage Wiring Connections
Fig. 23: 3-Stage Wiring Connections
Fig. 24: 4-Stage Wiring Connection
Installer action is required to electrically enable your heater to operate after making the power connections. You must make a closed contact connection on Stage 1 connector of the Central Point Wiring (CPW) board for temperature control connections. This will be done based on the controller option selected with your heater order.
1.For Pool and
24