INSTALLATION

5)Place the top bracket onto the top edge of 10) Install the 2 brick retaining clips, one on

the top panel (refer to Diagram 2).

each side.

Top Bracket

Diagram 2

6)Slide the top panel and bracket assembly carefully onto the baffle plate ensuring the panel is centered. Make sure the tabs of the topbracketfitintothebaffleopenings(refer to Diagram 3).

Final Installation

 

 

03-23

03-22

03-18

03-24

 

03-20

03-19 03-21

03-17

The "03" reference numbers (i.e. 03-23) are molded into the rear of each log.

Instructions:

1)Remove and carefully unwrap the logs from the box. Please handle with care and do not force them into position to avoid chipping.

2)Remove the top louver and fl ush door if installed (refer to page 14).

3)To remove the grate, loosen the two Phillips screws which are securing the grate. Slide the grate outwards to remove it from the unit (refer to Diagram 1).

Screws

Diagram 3

7)Insert the back panel by sliding it between the sidewalls of the fi rebox and the rear log support.

8)Before installing the side brick panels, re- move the screws from the side brick clips (refer to Diagram 4).

Diagram 4

9)Insert the side panel by positioning it fl at against the side walls. Tilt the panel towards the middle of the firebox, then insert the bottom front corner. Repeat on the other side.

LOG INSTALLATION

WARNING: Dangerous operating condi- tions may occur if these logs are not positioned in their correct certified locations. Read the following instruc- tions carefully and refer to the attached diagram.

Materials Required:

Complete Log Set (Part # 340-930) Contains the following:

 

Description

03-17

Bottom Log

03-18

Center Top Log

03-19

Front Log

03-20

Left Log

03-21

Right Log

03-22

Left top Log

03-23

Rear Log

03-24

Right Top Log

Diagram 1

4)Angle log 03-17 and slide it between the top and bottom burner tube under the “T” section until it touches the left grate support bracket (refer to Diagram 2).

03-17

Diagram 2

10

E33 FPI Direct Vent Gas Insert

Page 10
Image 10
Regency E33-NG, E33-LP LOG Installation, Final Installation, 03-23, 03-22 03-18 03-24 03-20 03-19 03-17, Instructions