INSTALLATION

GAS PIPE

7)

Pilot Outlet

 

 

8)

Main Gas Outlet

PRESSURE TESTING 9)

Alternative TC Connection Point

OPTIONAL

BRICK PANEL

The appliance must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig. (3.45 kPa). Disconnect piping from valve at pressures over 1/2 psig.

The manifold pressure is controlled by a regu- lator built into the gas control, and should be checked at the pressure test point.

NOTE: To properly check gas pressure, both inlet and manifold pressures should be checked using the valve pressure ports on the valve.

1)Make sure the valve is in the "OFF" posi- tion.

2)Loosen the "IN" and/or "OUT" pressure tap(s), turning counterclockwise with a 1/8" wide fl at screwdriver.

3)Attach manometer to "IN" and/or "OUT" pressure tap(s) using a 5/16" ID hose.

4)Light the pilot and turn the valve to "ON" position.

5)The pressure check should be carried out with the unit burning and the setting should be within the limits specifi ed on the safety label.

6)When fi nished reading manometer, turn off the gas valve, disconnect the hose and tighten the screw (clockwise) with a 1/8" fl at screwdriver. Note: Screw should be snug, but do not over tighten.

GAS INSERT

AERATION SYSTEM

The air shutter can be adjusted by moving the adjusting wire up or down. The wire is accessed through the bottom louver opening. Open the air shutter for a blue fl ame or close for a yellower

ame. The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude.

Minimum Air Shutter Opening:

5/16" Natural Gas

7/16" Propane

CAUTION: Carbon will be produced if air shutter is closed too much.

Optional Brick Panel Set:

 

Part #

Description

Qty

 

Top (brick) panel

1

 

Back (brick) panel

1

 

Left (brick) panel

1

 

Right (brick)panel

1

340-043

Top bracket

1

340-094

Bottom clips

2

511-031

Brick clips

2

Installation of Brick Panels:

1)

Remove top louver and glass door if in-

 

stalled.

2)

Remove the logs if they are already in

 

stalled. Note: the grate must be removed in

 

order to remove the bottom log. Ensure you

 

slide the bottom coal off to the right-hand

 

side to avoid chipping.

3)

Unwrap the brick pattern panels from the

 

protective wrapping. Handle the panels with

 

care as they can break easily.

4)

Remove the two screws from the bottom of

SIT Valve Description

1)Gas cock knob

2)Manual high/low adjustment

3)Pilot Adjustment

4)Thermocouple Connection - option

5)Manifold (Outlet) Pressure Tap

6)Inlet Pressure Tap

the baffle plate. Install the bottom clips onto

the baffle plate (refer to Diagram 1).

1

2

3

4

IN OUT

6 5

Note: Any damage due to carboning result- ing from improperly setting the aera- tion controls is NOT covered under warranty.

Note: Aeration Adjustment should only be performed by an authorized FPI Installer at the time of installation or service.

Bottom Clips

Diagram 1

E33 FPI Direct Vent Gas Insert

9

 

Page 9
Image 9
Regency E33-LP, E33-NG GAS Pipe, Pressure Testing, Optional Brick Panel, GAS Insert Aeration System, Diagram