INSTALLATION

GAS CONNECTION

GAS CONNECTION WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to this appliance.

1)If the appliance is to be installed into an existing chimney system, thoroughly clean the masonry or factory built fi replace.

2)The appliance is provided with an opening on the left hand side of the control compart- ment. A 3/8" NPT gas supply pipe must be brought near this inlet hole.

3)Locate the center point where the vent will pass through the chimney above the ap- pliance. Move the appliance into the exact location where it is to be installed. Ensure that the Insert is level.

VENTING

THE APPLIANCE MUST NOT BE CONNECTED TO A CHIMNEY FLUE SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE.

This appliance is designed to be attached to two 3" (76mm) co-linear aluminium fl ex running the full length of the chimney. The fl ue length must be a minimum length of 8 ' (2.44m) and a maximum of 35' (10.7m). See chart above for minimum distances from roof. Periodically check that the vent is unrestricted.

Masonry chimneys may take various contours which the fl exible liner will accommodate. However, keep the flexible liner as straight as possible, avoid unnecessary bending.

Part #

Description

948-305

3" Flex - 35 ft.

946-529

FPI Co-linear DV Vertical

 

Termination Cap

Alternate Approved Caps

980

Vertical Termination Cap

991

High Wind Cap

923GK

3" Co-linear Adaptor with

 

fl ashing

In areas of consistently high winds, we recom- mend using the Simpson Dura-Vent System (923GK adapter and 991 high-wind cap).

TheAir Intake pipe must be attached to the inlet air collar of the termination cap.

FLUE LINER

INSTALLATION

1)Cut the fl ex liner as required.

2)Mark the end of one liner to indicate Exhaust.

3)Connect the other end of the above liner to the exhaust side of the termination adap- tor, seal connection with high temperature silicone. Secure with gear clamp.

4)Connect the 2nd liner to the inlet side of the adaptor, seal connection with high tempera- ture silicone. Secure with gear clamp.

5)Install fl ashing.

6)Insert both liners into chimney, passing through the damper opening.

7)Install termination cap.

8)Connect the marked end of the liner to the exhaust collar of the vent connector plate marked with an "E", seal connection with high temperature silicone. Secure with gear clamp.

9)Connectthe2ndlinertotheintakecollar,seal connection with high temperature silicone. Secure with gear clamp.

10)Align vent connector plate with guides on unit.

11)Slide unit into masonry opening,while ensur- ing that the slot at the rear of the connector plate mates up with the hold down plate on the unit.

12)Secure with Screw.

NOTE:

1)Final gas connection should be made after unit is in place to avoid damage to line when pushing the unit into position.

2)Mill-pac may be used instead of high tempture silicone and screws may be used instead of gear clamps at connections of liner to inlet and vent collars.

8

E33 FPI Direct Vent Gas Insert

Page 8
Image 8
Regency E33-NG, E33-LP installation manual GAS Connection, Venting, Flue Liner Installation