FLUE LINER

INSTALLATION

FLUE LINER

GAS CONNECTION

INSTALLATION

 

INSTALLATION

1)Cut the fl ex liner as required.

2)Mark the end of one liner with an "E" to indicate Exhaust.

3)Connect the other end of the above liner to the exhaust side of the termination cap, seal connection with high temperature silicone. Secure with gear clamp or screws.

4)Connect the 2nd liner to the inlet side of the cap, seal connection with high temperature silicone. Secure with gear clamp or screws.

5)Install fl ashing.

6)Insert both liners into chimney, passing through the damper open- ing.

7)Install termination cap.

8)Connect the marked end of the liner to the exhaust collar of the vent connector plate marked with an "E", seal connection with high temperature silicone. Secure with gear clamp or screws.

GAS CONNECTION WARNING:

Only persons licensed to work with gas piping may make the necessary gas connections to this appliance.

1)When the appliance is to be installed into either an existing masonry chimney system or factory built fi replace, thoroughly clean the chimney before installation.

2)A 3/8" NPT gas supply pipe must be brought near the inlet hole. The valve inlet is on the right side of the unit.

3)Locate the center point where the vent will pass through the chimney above the appliance. Move the appliance into the exact location where it is to be installed. Ensure that the Insert is level.

NOTE: This unit is equipped with a heat sensor thermodisc which will prevent the blower from operating until the unit reaches the correct temperature.

GAS INSERT

AERATION SYSTEM

The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude. Open the air shutter for a blue fl ame or close for a more yellow fl ame.

9)Connect the 2nd liner to the intake collar, seal connection with high temperature silicone. Secure with gear clamp or screws.

10)Align vent connector plate with guides on unit.

11)Slide unit into masonry opening, while ensuring that the slots at the rear of the connector plate mates up with the hold down plate on the unit.

12)Secure with screw.

NOTE:

1)Final gas connection should be made after unit is in place to avoid damage to the liner when pushing the unit into position.

2)Mill-pac may be used instead of high tempture silicone and screws may be used instead of gear clamps at connections of liner to inlet and vent collars.

Minimum Air Shutter Openings

 

Vent Run

Burner Aeration

 

Setting

 

 

 

8' to 20'

NG: 3/16"

 

LP: 3/16"

3" x 3"

 

 

 

20' to 35'

NG: 3/16"

 

 

LP: 3/16"

 

 

 

 

 

 

8' to 20'

NG: 3/16"

 

LP: 3/16"

 

 

3" x 2"

20' to 35'

NG: 1/8"

 

 

LP: 1/8"

 

 

 

 

 

CAUTION: Carbon will be produced if the air shutter is closed too much.

Note: Anydamageduetocarboningresultingfromimproperlysetting the aeration controls is NOT covered under warranty.

Note: AerationAdjustmentshouldonlybeperformedbyanauthorized FPI Installer at the time of installation or service.