DV STOVE HORIZONTAL VENT KIT

INSTALLATION

DV STOVE HORIZONTAL VENT KIT

DV Stove Horizontal Vent Kit (2 ft. Part # 946-116 or 4 ft. Part # 946-216) includes all the parts needed to install the U39 with minimum horizontal and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown on page 15.

Qty. Description

1)1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,

Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter

2)1 Flex Liner, compressed aluminium 2 ply liner, 4" (102mm) inside diameter

3)4 spring spacers

4)1 90 deg. Elbow

5)1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces

6)1 Thimble Cover

7)1 Wall Thimble (2 pcs.)

8)1 Adapter

9)1 AstroCap Termination Cap

10)2 Trim Collar

11)1 tube of Mill-Pac, high temperature sealant

12)12 Screws, #8 x 1/2" Self tapping, Stainless Steel

13)13 Screws, #8 x 1/2" Self tapping, Black

14)4 Screws #8 x 1-1/2" Drill Point, Black

15)4 Screws #8 x 1-1/2" Drill Point, Stainless Steel

16)8 Wood screws #8 x 1"

Optional:

946-206 Vinyl Siding Standoff

for AstroCap

Note:

a)Liner sections should be continuous without any joints or seams.

b)This is an approved system, therefore components in this system must not be substituted for any other manufac- turer's products.

DV STOVE HORIZONTAL VENT KIT (# 946-116 & #946-216) INSTALLATION

Review the following sequence of in- structions which are typical of most in- stallations. The sequence may vary de- pending on wall thickness. Refer to vent location and clearance dimen-

sions on pages 8 to 13.

1)Set the unit in its desired location. Check to determine if wall studs will be in the way of the venting system, adjust location until all clearances are met and there are no obstructions.

Note: A 1-1/2"(38mm) clearance around the outer pipe must be maintained except that only a 1" (25mm) clearance is needed at the termination end.

IMPORTANT:

Do not locate termination hood where excessive snow or ice build- up may occur. Be sure to check vent termination area after snow falls, and clear to prevent accidental

Minimum Installation Height: U39: 59-3/4" ( 1518mm)

blockage of venting system. When using snow blowers, make sure snow is not directed towards vent termination area.

2)Assemble a trialfit to determine the vertical center-line for the vent termination.

a)Cut a 9-1/2" x 9-1/2" (241mm x 241 mm) square hole on both the interior and exterior wall.

b)Install wall thimbles on both interior and exterior wall with 4 wood screws (#8 x 1") per thimble.

c)Attach the 2 piece adjustable pipe section to the vent terminal and slide into position from the exterior. The larger diameter end of the ad- justable pipe goes to the vent terminal.

d)Install the 90o elbow onto the adjust- able pipe to determine the vertical centerline of the starter collar on the unit.