Installing the New Water Heater (cont’d)

Venting (cont’d)

WARNING

Be sure vent pipe is properly connected to prevent escape of dangerous flue gases which could cause dead- ly asphyxiation.

WARNING

Chemical vapor corrosion of the flue and vent system may occur if air for combustion contains certain chem- ical vapors. Spray can propellants, cleaning solvents, refrigerator and air conditioner refrigerants, swimming pool chemicals, calcium and sodium chloride, waxes, bleach and process chemicals are typical compounds which are potentially corrosive.

312'

1.The water heater requires its own (separate) venting system.

2.Only 3ABS Schedule 40 piping and fittings are accept- able materials on the first five feet of the outlet vent system.

3.3PCV, ABS, or CPVC Schedule 40 piping and fittings are acceptable materials for the inlet vent system and for the outlet vent system after the first five feet.

4.It cannot be connected to existing vent piping or chimney.

5.When venting through an outside wall, the vents must ter- minate horizontally to the outdoors.

B. ALL 40 AND 50 GALLON 40,000 BTU/HR MODELS

In the carton is supplied:

1.Two 3inlet and outlet PVC Schedule 40 - 45° vent caps. All other piping must be supplied by the supplier.

STRAPPING

Horizontal runs must be securely supported at 312 foot intervals and vertical runs supported at 5 foot intervals.

VENTING THROUGH AN OUTSIDE WALL

TWO 3PVC SCHEDULE 40 90° STREET ELBOW

REQUIRED*

SCHEDULE

40 PVC INLET AND

OUTLET PIPE

REQUIRED

ONE 3SCHEDULE

40 PVC 45° INLET ELBOW SUPPLIED

ONE 3SCHEDULE 40 PVC 45° OUTLET ELBOW SUPPLIED

A. ALL 75 GALLON MODELS AND 50 GALLON 65,000 BTU/HR MODELS

In the carton is supplied:

1.Two 3inlet and outlet PVC Schedule 40 - 45° vent caps.

2.A 3ABS Schedule 40 - 90 street ell; used to connect the out- let vent pipe to the water heater when the outlet vent pipe is to be turned horizontally directly off the blower.

3.A 5‘ section of 3ABS Schedule 40 outlet vent pipe (more may be required and must be supplied locally).

*If making an immediate horizontal run of vent off the blower, two 3PVC or ABS schedule 40 street elbows are required

1.

The water heater requires its own (separate) venting

 

system.

2.

3PVC, ABS, or CPVC Schedule 40 piping and fittings

 

are acceptable materials for the vent system on all 40

 

and 50 gallon models.

3.

It cannot be connected to existing vent piping or

3ABS SCHEDULE 40

 

90° STREET

 

OUTLET ELBOW

5' SCHEDULE

SUPPLIED

40 ABS OUTLET

3PVC SCHEDULE

PIPE SUPPLIED

 

40 90° STREET

 

INLET ELBOW

 

REQUIRED

SCHEDULE

 

40 PVC INLET PIPE

 

REQUIRED

ONE 3SCHEDULE

40 PVC 45° INLET ELBOW SUPPLIED

ONE 3SCHEDULE 40 PVC 45° OUTLET ELBOW SUPPLIED

chimney.

4. When venting through an outside wall, the vents must

terminate horizontally to the outdoors.

14

Page 14
Image 14
Reliance Water Heaters 184333-001, 606, 11-03 instruction manual Venting cont’d, ALL 40 and 50 Gallon 40,000 BTU/HR Models