Reliance Water Heaters 184333-001, 606, 11-03 Locating the New Water Heater cont’d

Models: 11-03 606 184333-001

1 40
Download 40 pages 6.32 Kb
Page 8
Image 8
Locating the New Water Heater (cont’d)

Locating the New Water Heater (cont’d)

Facts to Consider About the Location (cont’d)

Facts to Consider About the Location (cont’d) WARNING

Do not install in a confined area such a closet, unless you provide ventilation air as shown in the “Locating The New Water Heater” section. Never obstruct the flow of ventila- tion air. If you have any doubts or questions at all, call your gas company. Failure to provide ventilation air can result in a fire or explosion and can cause DEATH, SERIOUS BODILY INJURY, OR PROPERTY DAMAGE.

The venting system must be installed in a manner which allows inspection of the installation of the venting pipes and joints as well as periodic inspection after installation as required by the National Fuel Gas Code ANSI Z223.1.

Combustion Air and Exhaust WARNING

Vent termination must not be within 4 feet of any items such as gas meters, gas valves or other gas regulating equipment.

Manual background WARNING

If this water heater will be used in beauty shops, barber shops, cleaning establishments, or self-service laundries with dry clean- ing equipment, it is imperative that the water heater or water heaters be installed so that combustion and ventilation air be taken from outside these areas. Refer to the “Locating The New Water Heater” section of this manual and also the current edi- tion of the National Fuel Gas Code, ANSI Z223.1, also referred to as NFPA 54 for specifics provided concerning air required.

Manual background WARNING

Failure to have required clearances between water heater and combustible material will result in a fire hazard.

Combustion Air and Exhaust

Manual background WARNING

When determining the installation location for a power direct vent water heater, snow accumulation and drifting should be considered in areas where applicable.

Venting Through an Outside Wall – Clearances

0clearance for 3PVC, ABS, or CPVC Schedule 40 piping from combustible surfaces.

18minimum in all directions from any obstruction, such as a wall, that may interfere.

12minimum from the ground and corners, 9ceiling overhangs. Figure 2.

The Power Direct Vent outlet terminal shall terminate at least 36above any forced air inlet located within 10 feet. Figure 3.

The Power Direct Vent outlet terminal of 50,000 BtuH input mod- els or less shall terminate at least 9below, 9horizontally from or 9above any door, window or gravity air inlet into the building. Figure 3.

The Power Direct Vent outlet terminal of over 50,000 BtuH input models shall terminate at least 12below, 12horizontally from or 12above any door, window or gravity air inlet into the building. Figure 3.

18minimum from other natural draft (gravity) direct vent, power vent or power direct vent appliance inlet and/or outlet vent(s) when directly above or 135° to either side of center line. Figure 4, page 9.

24minimum from any appliance inlet and/or outlet vents when directly below or 45° to either side of center line. Figure 4, page 9.

The location selection must provide clearances for servicing and proper operation of the water heater. Figure 5.

Vent termination must not be within 4 feet of any items such as gas meters, gas valves or other gas regulating equipment.

Figure 2

A

A

A

PDV

TERMINAL

12min.

Figure 3

A - 9min. (50,000 BtuH input models or less)

A - 12min. (over 50,000 BtuH input models)

9min. from any overhang

C

Lof Flue

12min.

 

PDV

 

TERMINAL

 

B

A

36min. IF “B” DIMENSION

 

IS LESS THAN 120

 

FORCED AIR

 

INLET

 

GRADE

 

CORNER INSTALLATION

 

OF INLET AND OUTLET

 

NOT RECOMMENDED

8

Page 8
Image 8
Reliance Water Heaters 184333-001, 606 Locating the New Water Heater cont’d, Facts to Consider About the Location cont’d