Assembly (continued)

Installing the Pulley Guard

1.From the hardware pack locate the following: From among the loose parts find the following:

4 Pan Head Cross Serrated Screws 3/16-24 x 3/8" Belt Guard

2.With assistance set the jointer upright.

3.Mount the belt guard in place as shown using the four 3/16" screws.

Screw Pan Head Cr

 

Serr 3/16-24 x 3/8"

Belt Guard

 

NOTE: Fence mount removed for clarity

Installing Handwheel

1.

From the hardware pack find the following:

 

 

 

 

1

Screw Pan Head 1/4-20 x 5/8

 

 

 

 

1

Washer 1/4

 

 

 

 

Screw Pan Head w/Washer

2.

From among the loose parts find the following:

1/4-20 x 5/8"

 

 

Handwheel

1 Handwheel

3.Slip the handwheel onto the infeed table elevation shaft and install the washer and screw as shown.

16

Page 16
Image 16
RIDGID JP06101 manual Installing the Pulley Guard, Installing Handwheel, Serr 3/16-24 x 3/8 Belt Guard, 20 x 5/8