SECTION 8: U-TUBE HEATER INSTALLATION

Step 8.2 Critical Hanger Placement

 

Spreader

Bow

Bar

Shackle

Threaded

 

Suspension

Bar

 

Chain

 

Washers

Bolt

(Torque:

13.5Nm 129 in lb)

Tube and Reflector

Hanger

Optional

Hanging

Configuration

First Tube and

Reflector Hanger

NOTE: Spreader bar must be used on single suspension point installations. Do not hang heater from spreader bar.

Bow

Shackle

Suspension

Chain

Tube and Reflector

Hanger

 

229 cm ± 25cm

 

 

 

 

 

See Assembly

 

 

Description

Part Number

Drawing

 

 

Bow Shackle

E0007576

 

 

 

Tube/Reflector Hanger

03090100

 

 

 

Spreader Bar

07260010

 

 

 

Step 8.3 Burner Tube and Fan Tube Installation

 

 

 

 

 

 

 

Offset mounting

 

 

End View

hole must be

 

 

to the top

 

Fan Tube

 

 

 

 

 

Weld

Bottom

 

 

 

of Tube

Burner Tube

 

 

 

 

Description

Part Number

 

 

 

Burner Tube

03051100

 

 

 

Fan Tube

S5127W

 

 

 

 

 

 

 

27

Page 25
Image 25
Roberts Gorden BH15 service manual Critical Hanger Placement, Burner Tube and Fan Tube Installation