Roberts Gorden TF-250, TF-350, TF-300, TF-120, TF-200, TF-160, TF-380 service manual

Models: TF-380 TF-250 TF-160 TF-200 TF-120 TF-300 TF-350

1 72
Download 72 pages 34.8 Kb
Page 19
Image 19
Additional tubing length may be added to heater. Tubing must be heat-treated, aluminized or porcelain coated. Any additional tubing lengths are considered as vent length for length determination. Maximum venting length for minimum heater length is 45' (13.7 m) total, or 22.5' (7 m) on each tube.

 

 

 

 

SECTION 5: MAJOR COMPONENTS

Table 3: Component Package Guide

 

 

 

 

 

 

 

 

Tubing Length Each Side

 

Core Packages (2 Required)

 

 

 

 

 

 

Model

Minimum

Hot Rolled with

Aluminized with

Aluminized with

 

 

Aluminum Reflector

Aluminum Reflector

Stainless Steel Reflector

 

 

 

 

 

TF-120

20' (6 m)

CP20HRS

CP20ALUM

CP20ALUMSS

 

 

 

 

 

TF-160

20' (6 m)

CP20HRS

CP20ALUM

CP20ALUMSS

 

 

 

 

 

TF-200

30' (9 m)

CP30HRS

CP30ALUM

CP30ALUMSS

 

 

 

 

 

TF-250

40' (12 m)

CP40HRS

CP40ALUM

CP40ALUMSS

 

 

 

 

 

TF-300

50' (15 m)

CP30HRS + EXP20HRS

CP30ALUM + EXP20ALUM

CP30ALUMSS + EXP20ALUMSS

 

 

 

 

 

TF-350

50' (15 m)

CP30HRS + EXP20HRS

CP30ALUM + EXP20ALUM

CP30ALUMSS + EXP20ALUMSS

 

 

 

 

 

TF-380

60' (18 m)

CP30HRS + EXP30HRS

CP30ALUM + EXP30ALUM

CP30ALUMSS + EXP30ALUMSS

 

 

 

 

 

Additional tubing length may be added to heater. Tubing must be heat-treated, aluminized or porcelain coated. Any additional tubing lengths are considered as vent length for length determination. Maximum venting length for minimum heater length is 45' (13.7 m) total, or 22.5' (7 m) on each tube.

13

Page 19
Image 19
Roberts Gorden TF-250, TF-350, TF-300, TF-120, TF-200, TF-160, TF-380 service manual