Final Check and Trial Operation
To complete the installation, perform the following checks and tests to ensure that the air conditioner operates correctly.
Check the followings:
•Strength of the installation site
•Tightness of pipe connection to detect gas leak
•Electric wiring connection
•
•Drainage
•Grounding conductor connection
•Correct operation (follow the steps below)
ENGLISH |
1. Press the Power button and check the following:
The indicator on the indoor unit lights up.
2.Press the Mode button to select Cool or Heat mode.
In Cool mode, use Temp + or - button and set the temperature at 16°C.
In Heat mode, use Temp + or - button and set the temperature at 30°C.
• Approximately 3~5 minutes later, outdoor unit will start to operate and the Cool or Warm air will blow out.
• After 12 minutes of stationary condition check the indoor unit air treatment:
Cooling mode (indoor unit check) Heating mode (indoor unit check)
Inlet air temp. - Outlet air temp : From 10°C to 12°C ( indicative delta T)
Outlet air temp. - Inlet air temp : From 11°C to 14°C (indicative delta T)
3. Press the Air swingbutton and check the following:
4. Press the Power button to stop the operation.
• When you complete the installation successfully, hand over this manual to the user for storage in a handy and safe place.
Pump down procedure (when removing the product)
1.Turn on the air conditioner and select Cool mode to run the compressor for 3 minutes.
2. Release the valve caps on High and Low pressure side.
3. Use L wrench to close the valve on the high pressure side.
4. Approximately 2 minutes after, close the valve on the low pressure side.
5. Stop operation of the air conditioner.
6. Disconnect the pipes.
39